Tuesday, 17 November 2026 Search Subscribe
Two passenger trains on curving tracks between the platforms at Derby station
mattbuck, CC BY-SA 3.0, via Wikimedia Commons

Single licence for Great British Railways goes out to consultation, with responses due by 21 January 2027

The Department for Transport is consulting on one licence covering every part of the railway Great British Railways will run, issued by the Secretary of State, enforced by the Office of Rail and Road and reviewed roughly every five years, replacing the separate Network Rail network and station licences.

Great British Railways will need a licence before it can lawfully run the track and stations it is being created to operate, and the Government has now set out what that licence should contain. The Department for Transport opened a consultation on 12 November 2026 covering England, Scotland and Wales, and responses are due by 21 January 2027.

The central proposal is consolidation. Instead of the separate permits that different parts of the railway hold today, GBR would work under one licence spanning everything it operates. That licence would not carry detailed performance targets, which the department places in other documents such as the body's integrated business plan, and it is expected to be looked at again about once every five years.

Ministers, not the regulator, would grant it. The Secretary of State for Transport will issue the licence and set the overall strategy, remaining answerable to Parliament for how the system performs as a whole. The Office of Rail and Road sits underneath that role as the independent enforcer, monitoring GBR, advising the Secretary of State on its business performance and stepping in where licence obligations are not met.

A maroon and yellow Class 170 train standing at a covered platform at Derby station
Jonathan Hutchins, CC BY-SA 2.0, via Wikimedia Commons
A Class 170 train at Derby station. Under the draft licence, subsidiaries of Great British Railways carrying out licensed work would have to comply with the parent body's licence conditions.
One licence would span everything Great British Railways operates, replacing the separate permits held today.Daily Herald

The draft is organised in four parts. The first covers how GBR works with the regulator, including supplying the information the ORR reasonably needs and cooperating with independent reporters brought in for specialist assurance. The second covers passengers, tying GBR to consumer standards on matters such as delay compensation and accessible travel, and to working with the new Passenger Watchdog and London TravelWatch. The third covers stewardship and governance, from long term care of infrastructure to a published land disposal policy and a retail code of practice intended to keep ticket selling fair between GBR and third party sellers. The fourth covers shared industry duties, including membership of the Rail Safety and Standards Board, insurance arrangements and emergency access to stations and depots.

Subsidiaries are caught by the same net. Where a GBR subsidiary carries out licensed activity, the draft would require the parent to make sure the subsidiary complies, and to keep a current list of subsidiaries that operate railway assets and share that list with the regulator.

A passenger train curving into a platform at Derby station on a clear day
Richard Vince, CC BY-SA 2.0, via Wikimedia Commons
A train from Nottingham arriving at Derby. Network Rail's network and station licences are to be revoked before the single Great British Railways licence is granted.

Clearing the way for the new licence means ending old ones. Before the GBR licence is granted, the current Network Rail network and station licences are to be revoked through a process the Secretary of State will manage, while the ORR handles revocation of the operator licences held by publicly owned train operators inside the department's operator company. Operators outside GBR, including open access, devolved, freight, charter and heritage services, keep their own licences, and the ORR will consult separately on changes to those.

This consultation is not the last formal step. A separate notification procedure for the proposed licence under the Railways Bill is expected in 2027, once the department has considered the responses received by January. The Bill itself, once law, provides the legislation under which GBR is established as a publicly owned body bringing together rail infrastructure and most passenger services.

Filed under: Politics, Great British Railways, Railways, Department for Transport, ORR

Corrections
None to date. The Journal corrects errors promptly and transparently. Read our corrections policy.
Daily Herald
Staff reports